Tuesday, 2 September 2014

Day 13

Day 13 of production

I did some animation for the scene where the two robots are about to touch the IxD ball i imported the scene separately then try to match the sequence plus editing the animation with Livesh to fit the timing of the scene
adjusting the model position for the close up shot where the ball will explode

I did discuss with livesh on the animation and help out Emily with the camera on the scene and help fix the angle then giving the scenes to Emily for adjusting the perspective for the 3D scene before they do the lighting in the scene and fix the perspective of the close up shot
 

Monday, 1 September 2014

Day 12 of production

Day 12
Today was to touch up on the animation and composite the scenes for Ronald but we had problems with the model as ms arina mention that my model was very similar to the drawing and references picture so i worked on the model and modify the model head and thigh so I don't have the same problem later on i was able to change accordingly because on the model geometry i replace the parts without affecting the animation as such changes was made for IXD team i did mention to them about the change they were ok with it and proceed accordingly whatever they needed for the robot i was able to give them the sample of the new version of the model and come to an agreement that they are willing to replace the older model with the newer one without any problems
 




















The new design for the robot and replacing every robot animations as well